1. Interior painting by contract:
Contract start date: 06/27/11
Contract end date: 08/31/11
A: Engineering Computer Science (ECSC Phase 1)
Common areas to be painted:
- First floor – 199 F, G, H, I, J, K, M, N
- Second floor – 299 A, B, C, D, F, G, H, I, J, K, L, M
- Third floor – 399 A, B, C, D, F, G, H, I, J, K, L
B: Engineering Lab II
Common areas to be painted:
- Basement level – 099F, 099I, 099J, 014, 016, 018
- First floor – 199 A, B, D, E, F, H, 114, 116
- Second floor – 299 B, D, E, F, 212, 214
- Third floor – 399 A, B, C, D, F, G, H, I, J, K, L
2. Interior painting by Physical Plant personnel:
To start May 23rd – filler work to proceed continually through summer, ending no later than 08/31/11.
Hills South
Common areas to be painted:
- First floor – 199 A, D
- Second floor – 299 A, D
- Third floor – 399 A, D
- Forth floor – 499 A, D
3. Plaster and paint
Contract start date: 06/27/11
Contract end date: 08/31/11
Lederle Research Tower Stairwells
4. Exterior painting
Contract start date: 06/27/11
Contract end date: 08/31/11
Conte Center for polymer Research
All front exterior facade iron work at the building’s main entrance.