Summer contract work for Building Maintenance

1.  Interior painting by contract:

Contract start date: 06/27/11

Contract end date: 08/31/11

A: Engineering Computer Science (ECSC Phase 1)

Common areas to be painted:

  • First floor – 199 F, G, H, I, J, K, M, N
  • Second floor – 299 A, B, C, D, F, G, H, I, J, K, L, M
  • Third floor – 399 A, B, C, D, F, G, H, I, J, K, L

B: Engineering Lab II

Common areas to be painted:

  • Basement level – 099F, 099I, 099J, 014, 016, 018
  • First floor – 199 A, B, D, E, F, H, 114, 116
  • Second floor – 299 B, D, E, F, 212, 214
  • Third floor – 399 A, B, C, D, F, G, H, I, J, K, L

2. Interior painting by Physical Plant personnel:

To start May 23rd – filler work to proceed continually through summer, ending no later than 08/31/11.

Hills South

Common areas to be painted:

  • First floor – 199 A, D
  • Second floor – 299 A, D
  • Third floor – 399 A, D
  • Forth floor – 499 A, D

3. Plaster and paint

Contract start date: 06/27/11
Contract end date: 08/31/11

Lederle Research Tower Stairwells

4. Exterior painting

Contract start date: 06/27/11
Contract end date: 08/31/11

Conte Center for polymer Research

All front exterior facade iron work at the building’s main entrance.